Manroland Lubrication Maintenance Cycle Q&A: 5 Frequently Asked Questions

In the daily production of Manroland (Roland) series presses, the lubrication maintenance cycle is one of the most common issues encountered by press operators and maintenance personnel. This German-made model features large-diameter cylinders and high printing pressure, making it suitable for heavy stock and packaging printing. Its gripper mechanism is durable, but if maintenance is not carried out in a timely manner, the consequences can range from reduced registration accuracy and print quality to extended downtime in severe cases.

I. Typical fault symptoms include abnormal noise from dry-running parts, excessively rapid temperature rise, insufficient oil at central lubrication points, and sudden failures caused by missed maintenance.

II. Common Q&A

Q1: What are the most common causes of lubrication maintenance cycle issues?

A: The main causes are failure to follow the three-level maintenance schedule and use of incorrect oil grades.

Q2: What should be noted when handling this on a Manroland press?

A: It is necessary to follow standard procedures in conjunction with the RCI remote ink control system / CCI console.

Q3: How can recurrence be avoided?

A: Establish a maintenance calendar.

III. Handling steps

1. Execute and verify each item on the daily/weekly/monthly three-level maintenance checklist.

2. Check and replace lubricating oil with the specified grade.

3. Clear blocked lubrication points.

4. Establish a maintenance log.

The above methods also apply to models such as the R700, R900, ROLAND 700, and R505. For practical operation, please combine with the RCI remote ink control system / CCI console and on-site conditions. In complex situations, it is recommended to contact professional maintenance support through the printm.cn platform.

About Us

Copyright © 2025 Printm.Cn All Rights ReservedICP:黑ICP备2025043953号-2

Pantone Colourdrupa Printing ExhibitionIdealliance G7IdealliancePPZhan Packaging Printing