This case describes a reported capacity change at a South China printing plant after a used Heidelberg press was put into service. The figures of 120 to 180 reams per day are the operating information supplied for this article, not a guaranteed result for every installation. Before drawing conclusions, review the press configuration, paper format, job mix, staffing, make-ready time, planned maintenance and downtime. A stable increase depends on matching the machine to the workflow, training operators and measuring output under comparable conditions. Buyers should verify the source records and inspect the machine before relying on the figures.
What to verify
- Confirm the press model, format, configuration and installation date.
- Compare like-for-like production days and job requirements.
- Track make-ready time, stoppages, waste and maintenance events.
- Separate reported results from a performance guarantee and conduct an on-site test.






